73 results for "prime a screed"
How to prime a screed
out how to prime a screed before tiling with BAL Prime APD! Priming helps remove any absorbency from the screed, and ensures
BAL ALL-IN-ONE PLUS
DILUTED 1:4 FOR: Priming porous backgrounds when using a ready-mixed adhesive. Priming Screeds and Renders. Priming anhydrite (first
TN 24.23 Tiling to Anhydrite/Calcium Sulfate Based Screeds
of a suitable floor levelling compound (following priming a the screed) e.g. BAL LEVEL MAX should be considered before the
BAL Flexbone 2Easy Floating Uncoupling Mat
over cracked screeds, stains, residue and bitumen, plus no need to remove laitance from new screeds, or prime the surface
TN 03.24 - Use of Primers and Bonding Agents
to the first (i.e. cross coated). Cement:Sand screeds and Concrete BAL Prime APD: One coat diluted 1:1 with water. BAL Bond
How to tile over old tiles
bitumen or laitance. No priming needed. Tile immediately to contaminated, stained or cracked screeds and over bitumen.
BAL PRIME APD
certificates; BAL Prime APD Technical Datasheet (TDS) BAL Prime APD Health & Safety Datasheet (SDS) BAL Prime APD EMICODE
Installing BAL Board onto a screed
install BAL Board - lightweight MgO tile backer board - onto a screed before tiling.
BAL PRIMING SLURRY BOND
datasheets and certificates here; BAL Priming Slurry Bond Technical Datasheet (TDS) BAL Priming Slurry Bond Health & Safety
TN 08.23 Screed Drying Times
Bomb - Screed overlaid with BAL FLEXBONE 2EASY 1.5% CM HEATED SCREEDS Allow cement: sand screeds to dry for