Hi, how can we help you? Hi, how can we help you?

Hi, how can we help you?

Hi, how can we help you? Hi, how can we help you?

50 results for "high temperatures"

TN 01.23 - Use of Cement Based Products in Warm Weather
will vary with temperature: • Higher temperatures = shorter working and setting times. • Lower temperatures = longer working
0 comments
BAL Training - How to tile in colder weathers
Dave Rowley and David Hilton, BAL Technical and Training Managers host a training session on how to tile in colder weathers
0 comments
TN 08.23 Screed Drying Times
avoid these failures. FACTORS DELAYING DRYING • Low temperatures, high humidity. • The use of curing membranes significantly
0 comments
TN 06.23 Common Issues With Grouting
capping off Higher temperatures Colder temperatures Colder temperatures Higher temperatures - - - Movement
0 comments
TN 04.24 - Ceramic & Natural Stone Floor Tiling to Heated Sub-floors
Gradually increase the temperature by approximately 5°C per day until the maximum required working temperature is reached. Maintain
0 comments
TN 20.23 Swimming Pool Water Conditions and the Selection of Tile Grouts
where the water is supplied from. Hard water contains a high mineral content as it filters through limestone or chalk deposits
0 comments
TN 22.23 Tiling in Swimming Pools - Construction Drying Times and Pool Filling and Emptying Rates
irrespective of whether the pool shell is constructed to a high degree of dimensional accuracy to be able to tile directly
0 comments
BAL GROUT
BAL Admix GT1 to provide flexibility, increased adhesion and high bond strength. Available in white only. A fixers’ favourite
0 comments -1
TN 05.23 Tiling A Small External Patio & Ground Floor Terrace
• Do not carry out work unless the temperature is above 5°C and rising. The temperature range for which tiling can be satisfactorily
0 comments
BAL LIVE - Uncoupling Systems
installations from lateral (sideways) movement of screeds due to temperature and humidity changes.
0 comments